A clear plan for every unit you build.
Capture a good build as a template, start each serial as a project and put the same shop-floor list on every unit — with photo proof and offline mode.
- 1Laminate hullStructure
- 2Mount engine bedMechanics
- 3Wire control cabinetElectrics
- 4Pressure testQA
- 5Final inspectionQA
- C28-24017 · Harbor 17Active86%
- C28-24018 · Harbor 18Blocked52%
- C28-24019 · Harbor 19Planned8%
- Wire control cabinetC28-24018 · Harbor 183/6Photo required
- Wire control cabinetC28-24019 · Harbor 190/6Photo required
- Mount engine bedC28-24019 · Harbor 191/4
Where it goes wrong today
Every serial starts from a copied spreadsheet
Someone duplicates last month's file, fixes half the steps and emails it round. Each unit drifts a little further from the right sequence.
Nobody knows which hull is blocked
Status lives on a whiteboard and in people's heads. You find out a unit is waiting on parts when it misses its date.
Changing the process breaks units in progress
You improve the sequence, and suddenly the units already on the floor are following steps that don't match where they are.
Your words, our model.
Taskhull has only a few ideas, so it fits the way your team already talks about the work. Here's how they map.
- Template
- The build sheet for one unit
- Project
- Each serial or customer order
- Reference
- C28-24018
- My tasks
- The shop floor, on their phones
What changes with Taskhull
Versioned build sheets
Edit a draft, publish when the sequence is right. Every serial stays pinned to the version it started on until you choose to upgrade it.
One project per serial
Each unit has its own reference, dates, phases and status — so you can see which one is blocked and why.
Assign across open units
Select “Wire control cabinet” on every open serial this week and hand them to one person in a single action.
Works on the floor, offline
Instructions, drawings, checklists and required photos on a phone. Work queues while the hall has no signal and syncs later.
Questions, answered
Taskhull also runs
Employee onboarding
The same great first week for every new hire.
- Template
- Engineering onboarding
- Project
- Each new hire
QA & compliance
Procedures run the same way, with proof on every step.
- Template
- Incoming goods inspection
- Project
- Each audit, batch or inspection
Facilities & maintenance
Routines done to one standard, on every site.
- Template
- Quarterly HVAC service
- Project
- Each site visit or work order
Plan the next serial in Taskhull.
Turn your best build into a template and put the shop-floor list on every unit.